Have a question? Give us a call: 0086-15355876682

China Gold Supplier for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We stay with the basic principle of "quality initially, services first, steady improvement and innovation to fulfill the customers" for your management and "zero defect, zero complaints" as the quality objective. To perfect our company, we give the goods while using the good high-quality at the reasonable selling price for Ball Valve Standard Lockout, Portable Lockout Kit, Padlock Station, We are able to customize the solutions according to your needs and we can easily pack it for you when you purchase.
China Gold Supplier for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue Detail:

Feature

A.Fitted to all legal access points, the unique holder and insert ensure that the latest scaffold status is instantly visible from the scaffold build stage to dismantle.

B.The holder displays “DO NOT USE SCAFFORD” prior to inspection,then it is used in conjunction with a choice of three inspection inserts: prohibition,standard inspection and load classification.

What is the specific process of scaffolding tags?

The first step: prepare in advance

Prepare to shut down energy in advance. Common energy types listed on scaffolding tags include electromagnetic energy, mechanical kinetic energy, air energy water heaters, etc… and its potential risks. Put the protective maintenance device (safety lock), and prepare to shut down the energy in advance

Step 2: The work of notification

Announce the work done by operators and managers who are likely to be affected by safety protection and maintenance equipment.

Step 3: The work of turning off

Turn off mechanical equipment or equipment

Step 4: Locking work

Use appropriate safety factors to lock the device and lock all electrical energy to turn off mechanical equipment or equipment. When locking, make sure that no one can turn on the main power switch or shut-off valve. Then put a warning sign on the safety factor lock to prevent accidental operation.

Step 5: Inspection work

Check all equipment control devices and circuits to ensure that the mechanical energy is fully protected.

Step 6: Maintenance work

Carry out maintenance according to different equipment usage conditions, if some must be maintained once a month, some are longer…

Step 7: Return to normal operation

When all work is carried out and the scaffold tagging device is removed, please make it clear that all common tools and industrial equipment circuit locking devices have been removed. Please notify all employees as much as possible before showing the mechanical energy again.

Product Parameter

Material PVC
Type waterproof
Warranty 1 Year
Product Name durable scaffolding  tag,KT-01

z (1)
z (2)
z (3)
z (4)
z (5)
z (6)


Product detail pictures:

China Gold Supplier for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue detail pictures

China Gold Supplier for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue detail pictures

China Gold Supplier for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue detail pictures

China Gold Supplier for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue detail pictures

China Gold Supplier for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue detail pictures

China Gold Supplier for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue detail pictures


Related Product Guide:

To create much more benefit for consumers is our company philosophy; customer growing is our working chase for China Gold Supplier for Lockout Tagout Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue , The product will supply to all over the world, such as: Jordan, Cyprus, Uzbekistan, We aim to become the modern enterprise with the commercial ideal of "Sincerity and confidence" and with the aim of "Offering customers the most sincere services and best quality products". We sincerely ask for your unchanged support and appreciate your kind advice and guidance.
  • The product manager is a very hot and professional person, we have a pleasant conversation, and finally we reached a consensus agreement.
    5 Stars By Ina from Norway - 2018.12.28 15:18
    Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
    5 Stars By Steven from Azerbaijan - 2018.12.30 10:21

    Send your message to us:

    Write your message here and send it to us

    Send your message to us:

    Write your message here and send it to us

    Get the data sheet or free quote

    Write your message here and send it to us